Progress images of the building works

24 January 2006 (Photography by Andy Paraskos)

    

The steel structure of the Fly Tower and its temporary floor (left). 

The new handling units for the air-cooling system (right).

    

Taken from the Fly Tower, looking over the Rehearsal Rooms and out to south east Leeds (left).

Tower crane 2 inside the Upper Rehearsal Room (right).

                  

                  The Orchestra pit and lift (in yellow).